Verification register Energy, Climate, Space & Materials
Current reading
Readiness band and full integer triple
AI-assisted assembly · derived results
Readiness band
Watch
Primary summary from verified readiness
- Confidence
- 73% · stale
- Computed at
- 2026-08-20T10:54:39.442708+00:00
- Claimed
- 40
- Reported
- 40
- Verified
- 36
- Gap
- +4
Public ambition and stated capability
Observed practitioner reporting
Independently supported evidence
Claimed leads verified
Evidence strength Weak
Decision
What the current evidence supports
Human editorial judgment · 2026-08-20
Too early to adopt
- Why
- One 2026 lab device with a good headline power density AND credible abstract-level durability (10 washes, 60k cycles, breathable), but the supporting curves are paywalled, the field is saturated, and no end-to-end powered-load system is shown.
- Next
- Obtain the full text to confirm per-cycle output retention behind the 60,000-cycle / 10-wash headline and compare against the crowded fabric-TENG field; revisit if a power-management-integrated demonstrator or independent reproduction appears
Constraints
Blockers
No named blocker is present in the current public projection.
Evidence summary
Derived counts
AI-assisted assembly
- Total
- 12
- Tier 1
- 0
- Tier 2
- 2
- Tier 3
- 10
- Supports
- 6
- Contradicts
- 2
- Context
- 4
- Latest observed
- 2026-01-01
Counts and dates only. Raw signals, private excerpts, trust records, and internal corpus material are not published here.
Publication record
Revisions
Initial public reading
- 2026-07-19 Reading moved from watch to watch.