Verification register Energy, Climate, Space & Materials
Current reading
The readiness gap, in one scan
AI-assisted assembly · derived results
- Claimed
- 60
- Reported
- 58
- Verified
- 53
- Gap
- +7
Public ambition and stated capability
Observed practitioner reporting
Independently supported evidence
Claimed minus verified
Evidence strength Strong
Decision
What the current evidence supports
Human editorial judgment · 2026-06-28
Track; not yet
- Why
- A real, installed, first-of-kind U.S. system (100 kW, 7 floaters) — meaningful demonstration maturity — but it is intentionally non-grid-connected and produces no commercial performance data, so adoption-relevant proof lives in the overseas grid-connected sites.
- Next
- Watch the grid-connected commercial deployments (Taiwan Suao Port roadmap to 400 MW, Portugal 1MW, India) for measured capacity factors and LCOE before treating onshore wave energy as commercially proven.
Constraints
Blockers
No named blocker is present in the current public projection.
Evidence summary
Derived counts
AI-assisted assembly
- Total
- 8
- Tier 1
- 0
- Tier 2
- 3
- Tier 3
- 5
- Supports
- 3
- Contradicts
- 2
- Context
- 3
- Latest observed
- 2026-03-31
Counts and dates only. Raw signals, private excerpts, trust records, and internal corpus material are not published here.
Publication record
Revisions
Initial public reading
This is the initial public reading. No earlier readiness change is recorded.