pragma.vision Technology observatory & strategic foresight

Verification register Energy, Climate, Space & Materials

Readiness verdict

CarpeCarbon x Michelin Cuneo Solid-Sorbent Direct Air Capture Plant

A dated reading of what is claimed, reported, and independently verified in the current evidence.

As of
2026-10-29
Revision
1
Method
v1.3.0

Current reading

Readiness band and full integer triple

AI-assisted assembly · derived results

Readiness band

Watch

Primary summary from verified readiness

Confidence
83% · fresh
Computed at
2026-10-29T16:46:13.864585+00:00
Claimed
40

Public ambition and stated capability

Reported
40

Observed practitioner reporting

Verified
40

Independently supported evidence

Gap
0

Claimed and verified align

Evidence strength Strong

Decision

What the current evidence supports

Human editorial judgment · 2026-10-29

Track; not yet

Why
The agreement is a real integration of DAC into a tyre factory, described by the sources as CarpeCarbon's first DAC plant integrated into an industrial production process, with a modular design whose solution the company states is CE-marked, a TRL 6 pilot in Turin, a roughly 2 million euro initial investment and an on-site CO2 offtaker. But it is a pre-construction commitment at 300 t/yr nominal: no energy, cost or net-removal data are published, storage is unnamed, and the 50,000 t/yr figure is a company-wide ambition. Evidence supports watching, not relying on it.
Next
Watch for construction start and H2 2027 commissioning, published Turin pilot performance data (energy per tonne, capture rate), a named mineralisation storage partner, and credit-methodology certification.

Constraints

Blockers

No named blocker is present in the current public projection.

Evidence summary

Derived counts

AI-assisted assembly

Total
6
Tier 1
2
Tier 2
4
Tier 3
0
Supports
2
Contradicts
0
Context
4
Latest observed
2026-10-26

Counts and dates only. Raw signals, private excerpts, trust records, and internal corpus material are not published here.

Publication record

Revisions

Initial public reading

  1. 2026-10-29 Initial recorded band: watch.

Your opinion

Tell us anything.

What works, what doesn't, what's missing — especially about our watches, lenses, and the register itself. Anonymous is fine; leave an email if you'd like a reply.